TGC Data Global takes a data center from powered land to completion: the site and its power, offtakers and partners, design and engineering, equipment and construction, through commissioning. One team, start to finish. When speed matters most, we deliver it modular.
Most data center projects are stitched together from separate parties: one finds the land, another designs, another buys the equipment, another builds. Every handoff costs time, and no one owns the whole schedule. TGC is the full solution: one team that carries a project from powered land to a completed facility.
Our principals bring 25+ years architecting data center facilities, including leading the TD Bank data center program in Canada, and 20+ years of enterprise sales.
See their experienceTGC covers every stage of a data center project. Bring us in at the start and we carry it through, or bring us in for the stage you need.
The modular solution. When speed matters most, TGC delivers the facility as factory built modules, engineered around the client and energized twelve months after final design approval.
See the modular solutionPower is the constraint on every AI build. TGC maintains a pipeline of potential powered sites across North America and select international markets: greenfield land with transferable power rights, and existing facilities with land, building and power in place.
Every site is reviewed by our engineering team before we bring it forward, and locations, capacities and utility documents are released under NDA. Already hold land? We assess its power pathway and take the project forward from there.
TGC helps owners and developers secure offtakers among hyperscale, AI cloud and enterprise buyers, and joins projects through joint ventures that combine land, power and capital with our engineering and supply chain.
Bring us in early, before land closes or equipment is ordered, and we answer the questions that decide whether a project works: how much power, how dense, how cooled, how fast. Every design is engineered around the client’s requirements and specified so its long lead equipment can be ordered before the drawings are final.
Equipment, not design, is now the long pole on most builds. TGC sources transformers in half the usual lead time and orders long lead equipment while the design is still being finished, so it is on site when construction needs it.
Our engineers fix ratings and specifications early, so the order goes in while the rest of the design is finished. Every unit is tracked from the factory to the pad.
A project is finished when the facility is energized, not when the drawings are. TGC manages the build through construction, testing and commissioning, with the equipment arriving as the site is ready for it.
TGC also delivers data centers as factory built modules, for clients who need capacity sooner. No two clients spec the same facility: density, cooling, redundancy, power train and site constraints all change the answer, so every deployment is engineered around the client’s requirements. Once the final design is approved, delivery takes twelve months.
Air cooled containment modules, standard bus duct and PDU configuration, traditional UPS and transformer package.
Liquid-to-chip and rear door cooling skids, high amperage bus duct and power whips, enhanced UPS and transformer capacity.
Every critical subsystem arrives site ready: manufactured off site under controlled conditions, tested before shipping and assembled on site in weeks instead of months. Power, cooling, containment and controls each arrive as a finished piece and go together on the pad.
TGC is led by principals who have spent their careers architecting data centers and selling to large enterprises. The people who scope your project are the people who have delivered work like it.
Whether you have powered land, a design to engineer, equipment to source, a project that needs an offtaker or a facility already running, our team will scope it with you. We respond within 24 hours.