The full solution for data centers

From powered landto a completeddata center.

TGC Data Global takes a data center from powered land to completion: the site and its power, offtakers and partners, design and engineering, equipment and construction, through commissioning. One team, start to finish. When speed matters most, we deliver it modular.

Powered landUtility path and land controlModular solutionFactory built, set in placeEngineered hallsLayout, power and coolingCompletionCommissioned and supported A campus in schematic: powered land and its utility feed, engineered halls, a factory built module being set in place and the completed facility in operation.
Why TGC

Most data center projects are stitched together from separate parties: one finds the land, another designs, another buys the equipment, another builds. Every handoff costs time, and no one owns the whole schedule. TGC is the full solution: one team that carries a project from powered land to a completed facility.

1team From powered land through design, supply and construction to completion
50%shorter Transformer lead time through TGC, against a typical order
100+kW per rack AI density designs, with liquid-to-chip cooling
24/7support Monitoring, maintenance and response for live capacity

Our principals bring 25+ years architecting data center facilities, including leading the TD Bank data center program in Canada, and 20+ years of enterprise sales.

See their experience
The full solution

One team, from powered land to completion.

TGC covers every stage of a data center project. Bring us in at the start and we carry it through, or bring us in for the stage you need.

  1. Powered land Sites with power in motion, vetted by our engineers.
  2. Offtake and JVs Offtakers for the capacity and partners for the project.
  3. Engineering Each facility designed to its owner’s specification.
  4. Supply chain Long lead equipment ordered early. Transformers in half the time.
  5. Construction Traditional, prefabricated or modular, managed to the schedule.
  6. Completion Commissioned, energized, handed over and supported.

The modular solution. When speed matters most, TGC delivers the facility as factory built modules, engineered around the client and energized twelve months after final design approval.

See the modular solution
Powered land

Sites with power already in motion.

Power is the constraint on every AI build. TGC maintains a pipeline of potential powered sites across North America and select international markets: greenfield land with transferable power rights, and existing facilities with land, building and power in place.

Every site is reviewed by our engineering team before we bring it forward, and locations, capacities and utility documents are released under NDA. Already hold land? We assess its power pathway and take the project forward from there.

Utility Substation Site
What a site file contains
Land and building Parcel, title and entitlement information
Power Utility documentation and interconnection status
Studies Engineering and feasibility studies for the site
Imagery Current photography and aerials
Offtake and joint ventures

An offtaker turns a site into a project.

TGC helps owners and developers secure offtakers among hyperscale, AI cloud and enterprise buyers, and joins projects through joint ventures that combine land, power and capital with our engineering and supply chain.

Offtake Introductions to offtakers, backed by the engineering and delivery plan they need to commit.
Joint ventures We join projects as a partner, contributing engineering, supply chain and offtake alongside partners who contribute land, power or capital.
Partners bringLandPowerCapitalOfftake agreementJoint ventureTGC brings engineering, supply chain and offtakeOfftakerHyperscale, AI cloud or enterprise
Design and engineering

Engineers first. Everything else follows.

Bring us in early, before land closes or equipment is ordered, and we answer the questions that decide whether a project works: how much power, how dense, how cooled, how fast. Every design is engineered around the client’s requirements and specified so its long lead equipment can be ordered before the drawings are final.

Feasibility and planning Infrastructure planning and feasibility studies that test a project before capital is committed.
Site and power engineering Site selection support and power pathway review, from utility capacity to on site distribution.
Facility design Power, cooling, network and structural design, carried from concept through commissioning.
AI density engineering Liquid-to-chip and rear door cooling design for racks running 50 to 100+ kW.
Commissioning Commissioning plans built around pre-programmed controls, so a facility is ready to operate when it energizes.
Strategic consulting Advisory support for owners, developers and investors on new data center projects and partnerships.

Every design starts with the power path.

Schematic one line
UtilityGrid connectionSubstationMain transformerHalf the usual lead timeMV switchgearProtection and switchingUnit substationMedium to low voltageHalf the usual lead timeUPSUPSRide throughBusway and PDUPower to the rowRacks10 to 100+ kW per rackUtilityGrid connectionSubstationMain transformerHalf the usual lead timeMV switchgearProtection and switchingUnit substationMedium to low voltageHalf the usual lead timeUPSUPSRide throughBusway and PDUPower to the rowRacks10 to 100+ kW per rack
Supply chain

Transformers in half the time.

Equipment, not design, is now the long pole on most builds. TGC sources transformers in half the usual lead time and orders long lead equipment while the design is still being finished, so it is on site when construction needs it.

Transformer lead time

Our engineers fix ratings and specifications early, so the order goes in while the rest of the design is finished. Every unit is tracked from the factory to the pad.

TransformerHalf the usual lead timeSet on the padTracked from factory to site
Transformers Substation and medium voltage units, rated and specified by our engineers before the order goes in.
Switchgear and distribution Medium and low voltage switchgear, bus duct and power distribution, sized to the design.
Generators and turbines Generation for backup, on site and bridge power while the utility connection is completed.
Cooling CDUs, chillers, rear door heat exchangers and liquid-to-chip systems for AI density.
Data center hardware Servers, GPU systems and networking, sequenced to the build schedule.
Procurement management Specifications, vendor qualification, expediting and delivery tracking from order to set in place.
Construction and completion

Built, commissioned and handed over.

A project is finished when the facility is energized, not when the drawings are. TGC manages the build through construction, testing and commissioning, with the equipment arriving as the site is ready for it.

One team, so the phases overlap.

Build management Contractors, schedule and site logistics coordinated against the design and the equipment deliveries.
Delivery method Traditional, prefabricated or modular construction, chosen to fit the site, the schedule and the budget.
Equipment set in place Transformers, switchgear, generation and cooling delivered and installed in build sequence.
Testing and commissioning Integrated systems testing and commissioning plans built around pre-programmed controls.
Handover An energized, commissioned facility handed over with its documentation, ready for the offtaker.
Operations and support Maintenance, troubleshooting and 24/7 support once the facility is live.
The modular solution

Modular, but never cookie cutter.

TGC also delivers data centers as factory built modules, for clients who need capacity sooner. No two clients spec the same facility: density, cooling, redundancy, power train and site constraints all change the answer, so every deployment is engineered around the client’s requirements. Once the final design is approved, delivery takes twelve months.

12months From final design approval to energization, against 24 or more for a traditional build
1.2to 1.3 PUE Against 1.5 to 1.8 for a traditional build
70%less waste Construction waste cut through off site manufacturing
What we tailor to each client
Rack density From 10 to 20 kW air cooled through 50 to 100+ kW liquid cooled
Cooling Air containment, rear door heat exchangers or liquid-to-chip
Power train Standard or enhanced UPS and transformer capacity, high amperage bus duct
Controls Building management pre-programmed for each deployment
Site fit Layout and equipment yards engineered around the site
One platform, from colocation to AI factory
Standard density 10 to 20 kW per rack

Air cooled containment modules, standard bus duct and PDU configuration, traditional UPS and transformer package.

AI factory 50 to 100+ kW per rack

Liquid-to-chip and rear door cooling skids, high amperage bus duct and power whips, enhanced UPS and transformer capacity.

Pre-manufactured. Tested. Shipped. Installed.

Every critical subsystem arrives site ready: manufactured off site under controlled conditions, tested before shipping and assembled on site in weeks instead of months. Power, cooling, containment and controls each arrive as a finished piece and go together on the pad.

Power distribution Transformers, switchgear and UPS in pre-wired, factory tested modules ready for rapid on site integration.
Bus duct Pre-fabricated runs sized per design and bolted together on site for rapid power distribution.
Cooling systems CDUs, RDHx units and piping skids, pre-charged and leak tested. Liquid-to-chip cooling for AI density racks.
Containment and raised floor Standardized hot and cold aisle modules and pre-cut floor tiles for consistent, optimized airflow.
Fire suppression Pre-piped, pre-charged suppression skids manufactured to code and ready for immediate installation.
Controls and BMS Pre-programmed building management systems with plug and play commissioning.
Experience

Principals who have done this before.

TGC is led by principals who have spent their careers architecting data centers and selling to large enterprises. The people who scope your project are the people who have delivered work like it.

25+years Architecting data center facilities, from site selection through commissioning
99.999%uptime Sustained across enterprise data center portfolios
20+years Selling high value solutions to $100MM+ enterprises
Our principals’ experience includes
Mission critical delivery Led the TD Bank data center program in Canada, delivering mission critical financial infrastructure at national scale.
Full facility design Power, cooling, network and structural design, carried from site selection through commissioning.
Enterprise relationships Engagements with Google, Apple, Samsung, Ford and Toyota across product and market strategy.
Contact

Tell us what you need to build.

Whether you have powered land, a design to engineer, equipment to source, a project that needs an offtaker or a facility already running, our team will scope it with you. We respond within 24 hours.

Support available around the clock.

Phone Direct (949) 783-9827Toll free (888) 783-9827
Email support@tgcdataglobal.com
Office 1012 Brioso Drive, Suite 102Costa Mesa, California 92627